SUBSTITUTION OF CO-60 WITH ELECTRON ACCELERATOR

INSTALL OUR ELECTRON ACCELERATOR ONCE, PAY ONLY FOR POWER AFTER!


ADVANTAGES OF REPLACING CO-60 RESOURCES WITH OUR ELECTRON ACCELERATORS

Increase treatment productivity using electron accelerators by 20 times compared to Co-60
Use electron accelerator operating in E-beam and X-Ray modes
The service life of our electron accelerators is more than 30 years

Buy electron accelerator once and you won't have to buy Co-60 every five years
Once the accelerator is in operation, pay only for electricity

Beamcomplex provides a seamless transition from Co-60 sources to electron accelerators in existing gamma irradiation centers on flexible payment terms (three year installment plan, discounts, etc.)

Electron accelerator resonator and Double-window outlet device

Beamcomplex electron accelerators are available in two models:

The electron accelerator’s outlet device has two windows. One window emits E-beam and X-Ray, which irradiate boxes and bags with products vertically; the second window emits X-Ray which irradiates products on pallets horizontally.

If we bring into correlation the cost of the accelerator to the amount of the produced X-Ray, corrected to kCi, then the cost of 1 kCi will vary from USD 3.5 to 4.5.

ELECTRON ACCELERATOR INSTALLATION OPTIONS

  1. The electron accelerator may be installed in a bunker after Co-60 disposal. In this case, the existing bunker, as well as the conveyor system and all equipment will be used without changes. It will only be necessary to increase the total energy supply to the facility.
  2. The electron accelerator may be installed to replace Co-60 during its use and until its disposal. Such option has two variations:
    — in case of wet storage of Co-60 and processing products underwater, it is possible to place the electron accelerator in a room with Co-60. This will require the installation of a new conveyor system and the construction of concrete radiation shield for the module with an electron accelerator. As a result, wet product processing with Co-60, as well as product processing with E-beam/X-Ray using the the complex can be carried out in parallel until Co-60 is disposed. After disposal, the center’s specialists will process the products only at the complex.
    — in case of dry storage of Co-60 and product processing in a concrete bunker, it is necessary to locate the accelerator in the adjacent room and ensure its local radiation shield (concrete/metal). In this case, it is possible to use the existing conveyor system and, if the old bunker configuration allows, E-beam/X-rays can be directed into the bunker with Co-60 through a slot in the wall to irradiate the products with both Co-60 and E-beam/X-Ray in parallel until Co-60 is disposed.

Dry storage of Co-60

Wet storage of Co-60

Advantages of smooth transition from Co-60 to electron accelerator:

  1. Electron accelerator could replace Co-60 of both wet and dry storage.
  2. By installing the electron accelerator before Co-60 is disposed, you ensure an uninterrupted transition of product processing from Co-60 to E-beam/X-Ray while retaining customers and eliminating the risk of financial losses.
  3. The specialists are trained to work on the electron accelerator in advance.
  4. The full scope of documents permitting operation of the electron accelerator and product processing in E-beam/X-Ray modes is prepared in advance.
Get personalized offer

SMOOTH TRANSITION FROM CO-60 TO ELECTRON ACCELERATOR

During the step-by-step transition from Co-60 sources to electron accelerators, Beamcomplex engineers study the customer’s site and the feasibility of utilizing existing infrastructure systems.

Based on these findings, Beamcomplex engineers design the electron accelerator installation. We strive to make maximum use of the existing infrastructure (bunker, conveyor systems, cooling and ventilation systems, etc.), so that the installation process was quick and smooth.
The installation of new systems will be organized only if infrastructure changes are necessary.

SCOPE OF WORK TO EXECUTE CO-60 SOURCE SUBSTITUTION PROJECT

  1. Electron accelerator and necessary additional equipment delivery
  2. Integrating into the existing infrastructure systems (bunker, radiation shield, conveyor and cooling systems, etc.)
  3. Commissioning of the electron accelerator
  4. Training of the customer’s personnel to operate the electron accelerator

If necessary: construction of a new radiation bunker, radiation shield, conveyor and cooling systems and others.

1. Co-60 Source
2. Electron Accelerator in Workshop 1
3. Electron Accelerator in Workshop 2

OPERATIONAL ADVANTAGES OF BEAMCOMPLEX ELECTRON ACCELERATOR COMPARED TO CO-60 SOURCES

Electron accelerators consume only electrical energy during product irradiation

No need to spend much funds on new Co-60 isotopes to replace the spent ones every 5 years. No need to pay for compicated process of Co-60 replacement and disposal

Low operating costs for consumable materials, excluding electricity costs

Co-60 prices increase faster vs. electrical energy costs

Electron accelerator enables operations in two modes: X-Ray mode enables treatment of products of any thickness, while E-beam mode enables treatment at high speed and high productivity

The best DUR coefficient in a product is achieved owing to the high focusing of radiation beam

Beamcomplex electron accelerators may be powered from self-contained power sources